Nemokamas pristatymas nuo 29€

  • check 10 + milijonai knygų
  • check Naujienos (kiekvieną dieną)
  • check 1 + mln. klientų mus pasitiki
  • check Geros kainos % Nuolaidos
  • check Nemokamas pristatymas nuo 29 eur

Measuring Time: Improving Project Performance Using Earned Value Management - Mario Vanhoucke

Anglų
2012-03-07
127,04 € 169,38 €

-25% su kodu BOOKS

Turime sandėlyje pas mūsų tiekėją

Pristatymas per 12-18 d.d.

30 dienų grąžinimo politika

Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project¿s time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions d ... Visas aprašymas

Jums taip pat gali patikti

Aprašymas

Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project¿s time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions decision-making process during project tracking. As readers apply what is learned from the book, EVM practices will become even more effective in project management and cost engineering. Individual chapters look at simulation studies in forecast accuracy; schedule adherence; time sensitivity; activity sensitivity; and using top-down or bottom-up project tracking. Vanhoucke also offers an actual real-life case study, a tutorial on the use of ProTrack software (newly developed based on his research) in EVM, and conclusions on the relative effectiveness for each technique presented.

Daugiau informacijos

Autorius Mario Vanhoucke
Leidėjas Springer US
Series International Series in Operations Research & Management Science
Išleidimo metai 2012
Viršelio tipas Minkšti viršeliai
EAN 9781461425373
Parašykite savo atsiliepimą
Jūs peržiūrėjote: Measuring Time: Improving Project Performance Using Earned Value Management
Jūsų įvertinimas:

Goodreads Atsiliepimai

127,04 € 169,38 €