Nemokamas pristatymas nuo 29€

  • check 10 + milijonai knygų
  • check Naujienos (kiekvieną dieną)
  • check 1 + mln. klientų mus pasitiki
  • check Geros kainos % Nuolaidos
  • check Nemokamas pristatymas nuo 29 eur

Delay Analysis in Infrastructure Projects - Souva Majumder

Anglų
2017-07-04
50,92 € 78,34 €

-35% su kodu BOOKS

Turime sandėlyje pas mūsų tiekėją

Pristatymas per 12-18 d.d.

30 dienų grąžinimo politika

The purpose of this book is to increase the understanding of reasons behind the schedule delay and the risk factors that lead to such delay. This is a research work that adopted both qualitative as well as quantitative perspectives on risk management. Through this research a systematic and holistic approach of identification, assessment and evaluation of the risk factors that contribute to the schedule dela ... Visas aprašymas

Jums taip pat gali patikti

Aprašymas

The purpose of this book is to increase the understanding of reasons behind the schedule delay and the risk factors that lead to such delay. This is a research work that adopted both qualitative as well as quantitative perspectives on risk management. Through this research a systematic and holistic approach of identification, assessment and evaluation of the risk factors that contribute to the schedule delay in construction projects is established. Most of the Infrastructure projects are beyond their schedule due various reasons. The risk factors which are critically responsible for the cause of such delay needs to be identified and properly assessed. In order to deal with the complexity of real life construction project, this research has adopted an integrated approach of Interpretive Structural Modeling (ISM) and Bayesian Belief Network (BBN)with a SAP LAP analysis of the causes of delays in Infrastructure projects. This helps to accommodate both quantitative and qualitative data and improve upon the intuitiveness of the model. This book can be an excellent companion for all construction managers,engineers, consultants & research scholars for their further understanding.

Daugiau informacijos

Autorius Souva Majumder
Leidėjas LAP LAMBERT Academic Publishing
Išleidimo metai 2017
Viršelio tipas Minkšti viršeliai
EAN 9783847340393
Parašykite savo atsiliepimą
Jūs peržiūrėjote: Delay Analysis in Infrastructure Projects
Jūsų įvertinimas:

Goodreads Atsiliepimai

50,92 € 78,34 €